Last night we finished up the kitchen wiring and Jerry (my father-in-law) thankfully tackled the most difficult section. It involved wiring up two light series w/ the ability to switch them on/off from three locations in the kitchen. We also wired up 12 receptacles, a sink light switch and wiring overhead, a garbage disposal switch, all on 4 breakers. Also, we spent a good deal of time cleaning up tons of wiring in the basement and making sure other circuits were properly wired. For example, we found out that the basement and 2nd floor were all on the same circuit, so we split the circuits and wired a new switch in the basement. Oh yes, and we also wired up a light and GFCI switch out back on the deck so I can now charge my car close to the driveway! Thanks to Connie too for all the help w/ the kids and outdoor labor, as Carrie too was busy beautifying the outdoors (unfortunately we are in a hurry to go out and blogger isn't allowing me to post a picture of the front of the house).
So, my previous prediction was a bit ambitious, but I think that we are still on track to have the sheetrock hung in about a week.
Post a Comment